Review 2020-2021

Rivenhall Integrated Waste Management Facility
 

The proposed Integrated Waste Management Facility will be Indaver's first waste-to-energy facility in the UK. It will treat municipal solid waste - household and similar commercial and industrial, non-hazardous waste.


It will generate approximately 49MW of electricity for export to the National Grid which is enough to supply the power needs of around 60,000 households, equivalent to a town the size of Braintree in Essex or Cork city in Ireland.

Client

Indaver

Location

Rivenhall

Services

G&T has provided Cost Management services for both the Advanced Works - which consists of large scale bulk excavation and the Site Development Works which include one of the largest soil stabilised scopes in Europe.

arrow icon circle-arrow icon close icon desktop icon download icon facebook icon heart-outline icon heart icon linkedin icon logo-badge icon mobile icon quotes icon triangle icon twitter icon youtube icon